Sitolor logotip
  • Pavla Radića 12, 35000
    Slavonski Brod, Croatia
  • T: +385/35/405-404
    F:+385/35/405-410

Highways

1. HRVATSKE AUTOCESTE d.o.o. Repair of dilatation intermission on tunnel linings tunnels Grič, Mala Kapela and Sveti Rok
2 RIJEKA PROMET d.d. Repair of bridhe on river Rječina at crossing of strrets Ulica žrtava fašizma i Ulica Rade Šupića
3 BINA-ISTRA d.d. Repair works of existing concrete coating of tunnel Učka.
4 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains.
5 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of concrete coating in northern pipe of tunnels “Trsat”, “Škurinje I” and “Škurinje II”.
6 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts, drains and canals.
7 HRVATSKE AUTOCESTE d.o.o. Repair works of revision shafts in tunnels Plasina, Grič and Sveti Rok on highway A1 Zagreb – Split- Dubrovnik.
8 CESTING d.o.o. Repair works of roadway slab and water insulation on the bridge over river Bosut in Vinkovci, D55.
9 HRVATSKE CESTE d.o.o. Repair works on bridge “Belišće II” on state road D517.
10 GP KRK d.d. Repair works and implementation of water insulation on object Obnova DC II, phase B, section nr. 18 on DC D43, Ivanić Grad.
11 GP KRK d.d. Implementation of water insulation on bridge in Gomirje (Ogulin – Vrbovsko) on state road D42.
12 MEĐIMURJE GRADITELJSTVO d.o.o. Repair works on overpass Josipovac and approach ramps on state road D2.
13 HRVATSKE CESTE d.o.o. Reconstruction of bridge over river Karašica on state road D34 in Črnkovci.
14 SPEGRA INŽENJERING d.o.o. Repair works on overpass in junction Lučko (leg 9).
15 SPEGRA INŽENJERING d.o.o. Repair works of roadway from km 272+300 to km 273+100 (left and right), highway Zagreb-Lipovac.
16 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains.
17 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of concrete surfaces on objects: overpass on km 0+975, duct on km 33+800 and on km 34+700, viaduct Soboli, paths of NP Oštrovica, “New Jersey” protective fence and “bulls” NP Most Krk.
18 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of concrete surfaces on overpass in junction Vrata, protection fences “New Jersey” and “bulls” on NP Lučko.
19 VIADUKT d.d. Reconstruction of viaduct Anđeli.
20 CARIN d.o.o. Repair works on bridge Nova Zelina (north and south) on km 56+920 highway A3 Bregana-Zagreb-Lipovac.
21 SPEGRA INŽENJERING d.o.o. Repair works on overpass in junction Slavonski Brod (west) on km 211+100 on highway Bregana-Zagreb-Lipovaca.
22 SPEGRA INŽENJERING d.o.o. Repair works on overpass in junction Nova Gradiška on km 167+238 on highway Bregana-Zagreb-Lipovaca.
23 HRVATSKE CESTE d.o.o. Repair works on duct Spanovica on D38.
24 GP KRK d.d. Repair works of revision shafts and drains.
25 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete lining of the Vršek tunnel.
26 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains.
27 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete structures of: underpass at km 4+500, km 16+480 and km 30+000 and New Jersey-type protective fence on the Vrbovsko-Oštrovica section
28 AUTOCESTA RIJEKA-ZAGREB d.d. Replacement of garage doors with new section doors.
29 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works and construction of new ducts.
30 GP KRK d.d. Repair works of concrete on viaduct Golubinjak.
31 GP KRK d.d. Repair works of concrete on viaduct Soboli and concrete
32 SPEGRA INŽENJERING d.o.o. Repair works on the Gromačnik overpass (north and south) at km 212+000 of the Zagreb-Lipovac highway.
33 SPEGRA INŽENJERING d.o.o. Repair works on concrete surfaces on the south bridge across Kutina, canal at km 106+280 on the A3 highway.
34 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete structures: road passages at km 15+880, 30+550 i 37+000, Konj viaduct and concrete plazas of the Ravna Gora, Delnice and Oštrovica toll stations
35 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains.
36 INTECO d.o.o Creating of recessfor placing firefighting devices with newly
37 AUTOCESTA RIJEKA-ZAGREB d.d. Brick building-facade jobs and painting jobs, change of old metal doors of garage and mechanic workshop with new section doors in the base of the Branch for maintance TJ Delnice.
38 EURO-ASFALT d.o.o. Removing concrete with hydroblasting on lower slab of bridge Otok in Sarajevo.
39 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains in section PAC Kupjak-Delnice-Kikovica-Orehovica.
40 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete structures of: – the central dividing strip at 1+200 and 1+500km – the road passage at 31+640km- the Čavle viaduct.
41 GP KRK d.d. Repair works of concrete damages on renovation of roadway on viaduct SVILNO on HW Orehovica-Kikovica.
42 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts and drains on section PAC Kupjak-Delnice-Oštrovica-Kikovica.
43 GP KRK d.d. Repair works of concrete damages on renovation of PAC Vrata-Oštrovica and viaduct “Konj” and “Čavle”.
44 SWIETELSKY d.o.o. Repair works on objects “Demerje I” and “Demerje II” on section HW Zagreb-Karlovac.
45 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on the Tumbri underpass concrete surfaces on the Zagreb-Karlovac section of the highway and the Hreljin viaduct on the Delnice-Oštrovica section
46 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts in tunnel Tuhobić.
47 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works of revision shafts in tunnel Vrata.
48 SPEGRA INŽENJERING d.o.o. Hydroblasting concrete surfaces on the bridge across the river Sava at Ivanja Reka.
49 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete structures of the underpass at km 0+800 and Demerje underpass on the Zagreb-Karlovac section.
50 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete surfaces of manholes
51 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on concrete surfaces on the overpass at the Jastrebarsko junction and at the Kupčina bridge.
52 AUTOCESTA RIJEKA-ZAGREB d.d. Anticorrosive protection of Rijeka-Zagreb highway facilities: pedestrian fences on Kupčina and Kupa-Kupa bridges, portal girders on the Zagreb-Karlovac highway section and steel handrails on Zalesina, Delnice and Golubinjak viaducts
53 AUTOCESTA RIJEKA-ZAGREB d.d. Repair works on the railroad overpass in Hrvatski Leskovac.
54 HRVATSKE CESTE Works on protection of reinforced concrete construction antisound walls on highway near Slavonski Brod.
55 TIJESNO Tijesno draw bridge: pavement surfacing construction and protection of pedestrian paths with the Roadcoat material.
56 ĐĐ MONTAŽA Slav. Brod, LIMSKA DRAGA bridge anticorrosive protection of the steel bridge structure insulation of ortho-boards of the pedestrian surface.
57 HRVATSKE CESTE Repair works on bridges, portals, abutments and steel structures on the Okučani- Nova Gradiška section.